The first wall to be completed was the art wall. The full bid plate construction of the top of the wall creates an interesting visual condition that makes the construction challenging. Along with the students we developed a method for cutting the pieces on the table saw allowing for more specific control over the angles. The mobile kits fit underneath the wall.
0 Comments
Leave a Reply. |
Author
Mobile Design Box Research Team Archives
August 2021
Categories
|